Pipe Makers Canal Phase II Improvements
Status
Accepting Bids
Prebid Date | 10/31/24 10:30am |
Bid Date | 12/3/24 2:30pm |
Location
The project area is located downstream (east) of Pooler Parkway. All work will occur within designated canal right of way and construction easements.
The work will consist of clearing and grubbing approximately 4.9 AC of Pipemakers Canal right of way, grading, cleaning and bank stabilization associated with maintaining and improving 2,900 LF of existing drainage channel, installing approximately 272 LF of HDPE stormwater pipe with flared end sections and installing and maintaining associated erosion control measures. The Contractor shall be required to conform to all key requirements of the City’s Individual Wetlands Impact Permit issued by the US Army Corps of Engineers. The Contractor shall also give a credit to the City of Pooler for the revenue generated from timbering the property.
Sealed bids will be received for Pipe Makers Canal - Phase II Canal Improvements in the office of the City Clerk at the City of Pooler City Hall, 100 US Highway 80, Pooler, GA, 31322 at 2:30 PM on Tuesday, December 3, 2024, at which time they will be publicly opened and read. A mandatory pre-bid conference will be held at Pooler Department of Public Works, 1095 S Rogers St, Pooler, GA 31322 at 10:30 AM Thursday, October 31, 2024. Only official plan holders will be allowed to attend the pre-bid conference.